Copperhead Detention Basin After Cleanout
This photo shows the detention basin dry, after cleanout. The outflow structure is in the cage. This basin is the control for comparison with the retrofitted basin at Pon Court.
http://www.tceq.texas.gov./waterquality/tmdl/nav/69-gillelandcreekbacteria/69-copperhead-after/view
http://www.tceq.texas.gov./@@site-logo/tceqlogo-3colors.gif
Copperhead Detention Basin After Cleanout
This photo shows the detention basin dry, after cleanout. The outflow structure is in the cage. This basin is the control for comparison with the retrofitted basin at Pon Court.